In this video, you can see the ESP installation process for the LKU-B22 well. This well was originally completed as a Gas Lift well, but it was later converted to an ESP well to improve production.
The video shows the installation step by step, starting with preparing the equipment and checking that everything is ready before running the ESP into the well. As the installation continues, you can also see the main components of a conventional ESP, such as the motor, protector, gas separator, pump, power cable, and tubing.
One thing I noticed is that the power cable is attached carefully along the tubing using cable protectors to prevent damage while running in hole. The crew also performs electrical checks during the installation to make sure the ESP is working properly before completing the well.
Overall, the video gives a good understanding of how an ESP is installed and why each step is important. It also shows the importance of following the correct procedures and carrying out proper safety and quality checks to ensure the ESP can operate reliably once the well is put back into production.