- Seismic Survey
Acquire subsurface data to locate hydrocarbon prospects.
- Site Selection & Permits
Choose well location, secure environmental and drilling permits.
- Location Preparation
Level site, build access road, dig pits or prepare closed loop.
- Conductor Casing
Drill shallow hole, set large-diameter pipe, and cement to protect surface.
- Spud the Well – Surface Hole
Drill surface section, run casing, and cement to isolate shallow formations.
- Install BOP Stack
Install and test blowout preventer for well control.
- Drill Intermediate Section
Drill deeper to isolate pressured or unstable formations; run and cement casing.
- Drill Production Section
Reach the reservoir; collect logs and evaluate formation.
- Run Production Casing or Liner
Set final casing or liner across pay zone and cement it.
- Perforation
Use perforating guns to connect reservoir to wellbore (for cased hole).
- Well Completion
Install tubing, packers, and safety valves; stimulate if needed (acid or frac).
- Install Surface Equipment
Install wellhead, Christmas tree, and tie-in to flowlines.
- Start Production
Begin flowing hydrocarbons to surface for processing or storage.